Skip to content
BETA
Sign in Start

Menu

Account

Language

Safety

Oil Pipeline Repair Completed on Rama III Road

Matichon Online One source

Authorities have replaced a 14-meter section of a leaking oil pipeline on Rama III Road and are currently conducting safety tests to prevent future incidents.

According to a report by Matichon Online, maintenance crews have successfully completed the replacement of a 14-meter segment of a damaged oil pipeline located on Rama III Road. The repair was initiated following a leak that raised concerns regarding infrastructure integrity and public safety in the area.

Currently, the focus has shifted to technical verification. Officials are performing a 'Run Pig' procedure—a standard industry method using inspection tools—to ensure the structural integrity of the pipeline and to verify the quality of the repair work. These measures are intended to prevent a recurrence of the leak and to ensure the long-term safety of the surrounding environment.

For residents and travelers in the Rama III area, this development is significant as it addresses a potential hazard. While the physical replacement of the pipe is finished, the ongoing testing phase is critical for confirming that the system is fully operational and secure. Authorities have not yet provided a definitive timeline for when all testing will be concluded or when the site will be fully cleared of all maintenance equipment. Those navigating the area should remain aware of potential localized traffic adjustments while final safety checks are finalized.