Pa Sak Jolasid Dam Opens All Seven Spillway Gates Following Capacity Surge
The Pa Sak Jolasid Dam has opened all seven of its spillway gates after water levels exceeded 106.80% of its total capacity.
According to a report by Matichon Online on October 1, 2026, the Pa Sak Jolasid Dam has initiated a full-scale water release by opening all seven of its spillway gates. This action follows a significant surge in water volume, which has now surpassed 106.80% of the dam's total storage capacity.
For residents and travelers in the vicinity, this development is critical. The release of water is intended to manage the dam's structural integrity and prevent overflow, but it will inevitably lead to increased water levels in downstream areas. Those living near the riverbanks or planning travel to low-lying regions along the Pa Sak River should exercise extreme caution. Local authorities are expected to monitor the situation closely to mitigate potential flooding risks in surrounding provinces.
At this stage, the full extent of the impact on downstream communities remains to be confirmed. Residents are advised to stay updated through official announcements from the Royal Irrigation Department or local provincial authorities. Travelers should check local road conditions and avoid river-based activities in the affected areas until the situation stabilizes. It is currently unclear how long the spillway gates will remain fully open, as this will depend on ongoing rainfall and inflow patterns in the upper catchment areas.