Pa Sak Jolasid Dam Opens All Floodgates Amid Rising Water Levels
The Pa Sak Jolasid Dam in Lopburi has opened all seven floodgates as water levels exceeded capacity, with further releases planned ahead of expected heavy rainfall.
On September 30, 2026, the Pa Sak Jolasid Dam in Phatthana Nikhom District, Lopburi, officially opened all seven of its floodgates for the first time this year. According to Khaosod Online, this action was taken because the reservoir's water volume reached 930.78 million cubic meters, or 106.80% of its normal storage capacity.
Currently, water is flowing into the reservoir at a rate of approximately 550 cubic meters per second. To manage the surplus, the dam has increased its discharge rate from 115.08 cubic meters per second to 145 cubic meters per second, with plans to gradually increase this to 400 cubic meters per second in the coming days.
This situation is significant for residents and travelers in downstream areas, as the increased discharge is a proactive measure to create capacity for anticipated heavy rainfall between October 3 and October 6, 2026. Authorities have issued a warning for those living near the riverbanks to monitor the situation closely. While the dam is managing the flow through a stepped release process, the exact impact on downstream water levels remains to be confirmed. Travelers planning to visit areas along the Pa Sak River should stay updated on local flood warnings and exercise caution near waterways.