Skip to content
SawaLife BETA

Safety

M82 Motorway Section Set to Open Following Safety Certification

One source
M82 Motorway Section Set to Open Following Safety Certification

The Department of Highways has confirmed that the M82 elevated motorway section between Bang Khun Thian and Ban Phaeo has passed structural integrity tests and is scheduled to open on August 28, 2026.

According to a report by Prachachat Business, the Department of Highways (DOH) has officially confirmed the safety of the M82 elevated motorway, which connects Bang Khun Thian, Ekkachai, and Ban Phaeo. Following a collaborative structural assessment conducted with the Engineering Institute of Thailand (EIT), the project has met all required safety and quality standards.

Director-General of the Department of Highways, Piyapong Jiwattanakulpaisarn, announced that the final evaluation took place on August 15, 2026. Based on these results, the department has cleared the route for public use, with an official opening date set for August 28, 2026.

For residents and travelers in the area, this development is significant as it aims to improve traffic flow and connectivity between Bangkok and the western provinces. The opening of this elevated section is expected to reduce congestion on the existing ground-level roads. While the DOH has confirmed the structural integrity of the project, motorists should remain attentive to official signage and traffic management updates as the opening date approaches. Further details regarding toll rates or specific entry and exit points may be provided by the Department of Highways closer to the launch date.